Construction and engineering questions, answered directly
Construction claims live or die on two things: whether the firm does genuine design work, and what its contracts say. These answers explain both. They are general information, and your contracts and projects decide your position.
Can a construction company really claim a research credit?
Yes, some can, but the qualifying core is design and engineering, not building. Firms that employ engineers and designers who solve technical problems on complex projects are the usual candidates. A firm that only builds to other people's finished designs usually has little to claim.
Which design activities are usually looked at?
Structural, mechanical, electrical, and systems design where the solution was not known at the start: unusual site conditions, performance requirements, energy targets, or integrating systems in a tight space. Calculations, modeling, and design iterations are the records that show it.
Why do contracts matter so much in construction claims?
Because customer funded work is tested against who bears the risk and who owns the design rights. A fixed price design contract where the firm is paid only for an accepted design looks very different from a contract that pays for effort regardless of result. This is why contracts are read before any numbers are built.
Does value engineering count?
It can, when it involves evaluating alternatives to meet a technical requirement, such as redesigning a system to meet load, code, and budget constraints that conflict. Swapping in a cheaper standard product with no technical uncertainty is purchasing, not research.
Does BIM modeling and drafting count?
Modeling that is part of resolving design problems can be included with the design work it supports. Pure drafting, converting finished designs into drawings or models, is usually treated as production work. Studies look at what the modeler was actually doing, task by task where records allow.
What about field problem solving during construction?
Solving an unexpected technical problem in the field, where the fix had to be designed and tested, can be qualifying work. Routine coordination, scheduling, and fixing workmanship errors are construction management, not research, even when they are difficult.
Do design build and design only firms face the same tests?
The same rules apply, but the facts differ. Design only firms usually have cleaner design activity and messier contract questions. Design build firms have the opposite pattern. Either can have a valid claim, built from different evidence.
Can work on public projects count?
Government work is analyzed under the same funded research rules, and public contracts often contain detailed rights and payment terms. The contract language decides most of these cases, so public project claims should be reviewed contract by contract.
What records should a firm keep for a study?
Design calculations and revisions, RFIs and submittals that show technical problem solving, meeting notes on design decisions, timesheets split between design and construction phases, and the contracts themselves. Timesheets that mix design and field time are the most common weakness.