Manufacturing questions, answered directly
Manufacturers often qualify on work they think of as normal engineering: getting a product to work, or a line to run the way it should. These answers cover the situations that come up most. They are general information, and plant level facts decide real claims.
Does designing a new product qualify?
Designing a product where performance, materials, or manufacturability were uncertain, and testing prototypes or samples to resolve those questions, is core qualifying activity. The design, engineering, and testing time is usually the center of a manufacturing claim.
What about improving our production process?
Process improvement can qualify when it involves real experimentation: trialing new methods, settings, tooling, or materials to improve speed, quality, yield, or cost. Simply running the existing process more carefully does not, and the difference shows in whether alternatives were evaluated.
Do prototypes and test pieces count as costs?
Materials consumed in prototypes and testing are commonly reviewed as supply costs in a study. Pieces that are sold to customers, or that become part of saleable inventory, are treated differently, which is why production records and scrap records are both useful.
Does tooling work count?
Designing and building tooling to make a new or improved product can be part of the development work. Buying standard tooling off the shelf is different from engineering custom tooling through trial and adjustment, and a study separates the two.
Is the first production run qualifying work?
Partly, sometimes. The trial and adjustment portion of a first run, where settings and methods are still being proven, can look like experimentation. Once the process is settled and the run is ordinary production, it is production, not research. Run records and operator notes help draw that line.
Does routine quality control testing count?
Routine inspection and testing of finished output is usually excluded. Testing done to resolve a design or process question, such as why a part fails under load and what change fixes it, is a different activity and can count. The purpose of the test is the deciding factor.
We design products that customers then own. Who claims?
It depends on the contract: who pays if the design fails, and who keeps the rights to the design. Manufacturers doing design work under contracts that leave the risk and the rights with the customer often find the claim sits with the customer instead. Contracts are reviewed early in a study for this reason.
Can shop floor employees' time count, or only engineers?
Both can, for the time each person spends on the qualifying work itself. Machinists, technicians, and operators who build prototypes, run trials, and test adjustments are often part of the activity, alongside the engineers who direct it.
What records should a plant keep?
Engineering drawings and revisions, prototype and trial logs, test results, scrap and rework records tied to development, job travelers for experimental work, and time records that split development from production. Most plants already create most of this; the trick is keeping it in one place.